DepartmentPhases
Development in four phases.Phase-wise design capacityPhase One: 4.4 mppa
Phase Two: 5.8 mppa
Phase Three: 9.4 mppa
Phase Four: 13.1 mppa
Ultimate potential: 28 mppa
mppa: million passenger per annum.
Traffic trigger for phase-wise developmentUpon achieving 80% design capacity of previous phase.
HangarsOne
TerminalOne
Aprons/RampsAprons are planned to park 18 Code C aircrafts in Phase1 development.
TaxiwaysTaxiways are planned as per details below in phase 1 development.
1 TWY North Full length parallel taxiway
2 TWY A1-A8 All 8 taxiways (6 cross taxiways and 2 rapid exit taxiways). A1 and A8 are for Code F aircraft.
3 Taxi lanes Taxi lanes for 18 aircraft stands
RunwayRunway Orientation (10-28)
Authority HangarAdequate space for parking of 2 ( two ) code C aircraft’s ( Aeroplane & Helicopter )