Mopa Airport
| Department | Phases | 
|---|---|
| Development in four phases.Phase-wise design capacity | Phase One: 4.4 mppa Phase Two: 5.8 mppa Phase Three: 9.4 mppa Phase Four: 13.1 mppa Ultimate potential: 28 mppa mppa: million passenger per annum. | 
| Traffic trigger for phase-wise development | Upon achieving 80% design capacity of previous phase. | 
| Hangars | One | 
| Terminal | One | 
| Aprons/Ramps | Aprons are planned to park 18 Code C aircrafts in Phase1 development. | 
| Taxiways | Taxiways are planned as per details below in phase 1 development. 1 TWY North Full length parallel taxiway 2 TWY A1-A8 All 8 taxiways (6 cross taxiways and 2 rapid exit taxiways). A1 and A8 are for Code F aircraft. 3 Taxi lanes Taxi lanes for 18 aircraft stands | 
| Runway | Runway Orientation (10-28) | 
| Authority Hangar | Adequate space for parking of 2 ( two ) code C aircraft’s ( Aeroplane & Helicopter ) |